Publication
Avaliação de riscos no laboratório de prótese dentária
datacite.subject.fos | Engenharia e Tecnologia::Gestão Industrial | por |
dc.contributor.advisor | Matias, João Carlos de Oliveira | |
dc.contributor.author | Marques, Pedro Miguel Piteira | |
dc.date.accessioned | 2018-07-31T14:34:13Z | |
dc.date.available | 2018-07-31T14:34:13Z | |
dc.date.issued | 2014-11-7 | |
dc.date.submitted | 2014-10-7 | |
dc.description.abstract | No âmbito desta Dissertação pretendeu efetuar-se, uma avaliação de riscos num Laboratório de Prótese Dentária, na empresa Polismile Unipessoal Lda.. Nesta avaliação de riscos, utilizou-se um método quantitativo, designado de Método W. T. Fine, sendo que, após a aplicação das suas várias etapas, no final foram definidas um conjunto de medidas corretivas / preventivas que foram quantificadas monetariamente, de acordo com essa possibilidade deste próprio método e que se sugere ao Empresário a implementação de tais medidas, de forma a eliminar ou minimizar os riscos avaliados, a que os colaboradores se encontram sujeitos na suas tarefas diárias. Deve referir-se, ainda que, como trabalho complementar usado numa das etapas de aplicação deste método, deverão ter-se em atenção as listas de verificação (Checklists) aplicadas a cada um dos Equipamentos de Trabalho do Laboratório de Prótese Dentária, disponibilizadas no Anexo I. | por |
dc.description.abstract | In context of this Dissertation has intended to take place, an risk assessment at the Dental Prothesis Laboratory, in Polismile Unipessoal Lda. company. An risk assessment, has used an quantitative method, so-called W. T. Fine Method, therefore, after application of his several stages, in the end was defineded an whole corrective / preventive measurements that was monetary quantified, of agreement with that possibility of this himself method and what suggest it to businessman the implementation of such measurements, of way to eliminate or minimize the assessed risks, that the collaborators are subject in this diaries duties. Still refer that, as supplementary work used in an stages of application of this method, will it has in attention the applied Checklists to each an Equipments of Work of the Dental Prothesis Laboratory, availabled in the Attached I. | eng |
dc.identifier.tid | 201384825 | |
dc.identifier.uri | http://hdl.handle.net/10400.6/5546 | |
dc.language.iso | por | por |
dc.subject | Avaliação de Riscos | por |
dc.subject | Equipamentos de Trabalho | por |
dc.subject | Listas de Verificação | por |
dc.title | Avaliação de riscos no laboratório de prótese dentária | por |
dc.type | master thesis | |
dspace.entity.type | Publication | |
rcaap.rights | openAccess | por |
rcaap.type | masterThesis | por |
thesis.degree.name | 2º Ciclo em Engenharia e Gestão Industrial | por |
Files
Original bundle
1 - 1 of 1